Beech Model B24R Sierra
Failed NLG Yoke Assembly
The nose gear yoke assembly departed the aircraft after a hard landing. Inspection revealed existing corrosion in the strut with signs of an existing crack. The corrosion and crack occurred where the strut attaches to the yoke.
Part total time: 4004.0 hours
Cessna 172P Skyhawk
Corroded Control Yoke
During preflight inspection, pilot’s yoke failed as proper control movement was verified. Corrosion discovered from the inside out below the pivot point.
Part total time: Unknown
Cessna A185F Skywagon
Failed Ski Yoke
While taxiing the ski-equipped airplane on a snow-covered lake, the pilot initiated a left turn. The right ski went into some overflow and the outboard welds on the ski yoke broke. As a result, the tire/wheel went into the snow and the aircraft went onto its back.
Part total time: Unknown
Cessna A185F Skywagon
Corroded Control Yoke
Hole noted in steel tube on left side of control yoke (p/n 0711850-1) two inches from welded joint to vertical tube. Similar hole found on opposite side when probed with sharp pick. Manufacturer’s SB 01-3 found not accomplished.
Part total time: 4455.0 hours
Learjet Model 31A
Corroded Control Yoke Hardware
During a scheduled inspection, technicians encountered corroded and bent control yoke boss attachment hardware that proved difficult to remove. After consulting with the manufacturer, the final recommendation was to remove the boss via cutting the bolts (p/n 2315152-33). Manufacturer was able to repair the yoke assembly using SB 31-27-11 and kit 2381602-801. Aircraft had been parked outside without gust locks.
Part total time: 3336.0 hours
Pilatus PC-12/45
MLG Yoke Assembly Failure
During taxi, the left main landing gear yoke assembly fractured at the lug fittings for the trailing link axle attachment. The trailing link partially separated and the aircraft came to rest on the remaining assembly. A replacement gear assembly was installed. Damage included the left MLG assembly, left gear door and hinge, and some small localized lower wing dents.
Part total time: 21,759.0 hours
Pilatus PC-12/47
Binding NLG Steering Yoke
During a scheduled inspection, the technician noticed an unusual noise from the nose landing gear area. Investigation revealed binding in nose landing gear steering yoke assembly. Removed and replaced retaining washer, bolt, rod end assembly, D-ring, ring and clevis pin.
Part total time: 267.0 hours